Saturday, 28 November 2026
Breaking News
OPENED IN 2012, THE RS. 300 CRORE ABOHAR-FAZILKA RAIL TRACK HAS ONLY A FEW TRAINS Finally Haryana Human Rights Commission gets Secretary after a gap of 7 months Fazilka Police Operation: Glock Pistol, .30 Bore Pistol, and Country-Made Firearm Recovered in encounter SSP BHUPINDER SINGH SIDHU GIVEN WARM FAREWELL IN FEROZEPUR YOUTH’S DEATH SPARKS PROTEST IN ZIRA, FAMILY SEEKS JUSTICE CIVIL DEFENCE MOCK DRILL PUTS FEROZEPUR’S EMERGENCY RESPONSE SYSTEM TO TEST SGNR. SP UNVEILS POSTER FOR THE PREVENTION OF CHILD MARRIAGE MEN AND WOMEN SHOULD RECOGNIZE AND RESPECT EACH OTHER’S CONTRIBUTIONS: PROF. TANKESHWAR KUMAR GURUKUL GLOBAL SCHOOL AND SACRED HEART SCHOOL CROWNED CHAMPIONS AT DEVRAJ MALIK MEMORIAL BASKETBALL TOURNAMENT THOUSANDS PARTICIPATE IN INSAAF MARCH, EVERY CONGRESSMAN’S GOAL IS TO SEE CONGRESS RETURN TO POWER: WARRING
Punjab Trending

OPENED IN 2012, THE RS. 300 CRORE ABOHAR-FAZILKA RAIL TRACK HAS ONLY A FEW TRAINS

Raj Sadosh/ Abohar.

During his visit to Abohar railway station, Ambala Division Railway Manager (DRM) Vinod Bhatia was presented with a set of demands by the Samaj Sudhar Sabha and Railway Passengers Sangharsh Samiti aimed at improving regional rail connectivity.

A group of social activists highlighted several long-standing infrastructure and service issues. The memorandum, addressed to Ashwani Vaishnav, Minister of Railways, was presented to the DRM for serious consideration and action.

The Samiti delegation, led by president Rajesh Gupta, strongly demanded the restoration of this train, which connected Sriganganagar to Delhi (and extended to Howrah) via Abohar. Suspended during the 2020 pandemic, its continued absence has forced travellers across seven states to rely on more expensive private bus services.

Passengers called for the construction of a new 28-kilometre track linking Abohar to Sadulshehar to boost trade and travel across Punjab, Haryana, and Rajasthan.

Representatives pointed out that the 42-kilometre stretch between Abohar and Fazilka—built in 2012 at a cost of Rs 300 crore—remains heavily underused, with only two trains operating on it daily.

The group recommended extending Train No. 14639/14640 (Ferozepur–Mohali) via Fazilka, as well as extending Train No. 14701/14702 (Mumbai Bandra Aravali Express) to better serve the region. The train is parked for about 19 hours at Sriganganagar station.

0 Comments