Friday, 20 November 2026
Breaking News
CBI COORDINATES RETURN OF WANTED FUGITIVE OF MAHARASHTRA POLICE, MOHD MAZIN, FROM UAE CBI ARRESTS BANK OF BARODA MANAGER AND TWO AGENTS IN RS. NINE LAKH BRIBERY CASE CBI ARRESTS BANK OF BARODA MANAGER AND TWO AGENTS IN RS. NINE LAKH BRIBERY CASE YOUTH FROM TARN TARAN MURDERED BRUTALLY AT ABOHAR JAKHAR TRUST READY TO ORGANIZE ABOHAR MARATHON ON NOVEMBER 22 MAN BEATEN TO DEATH FOLLOWING DISPUTE OVER COW DUNG BEYOND PLANTATION DRIVES : YUVSATTA DELEGATION PRESENTS FOUR PROPOSALS TO GOVERNOR FOR SCIENTIFIC TREE CARE AND A GREEN FUTURE MyFLEDGE DIRECTORS AND FAMILY BOOKED IN ₹4.44 CRORE CHEATING AND FORGERY WITH MAHABHARAT ACTOR AAYUSH SHAH MAJOR BREAKTHROUGH IN PAHARGANJ BAR FIRING CASE! MAIN ACCUSED ARRESTED AFTER AN EXCHANGE OF FIRE IN SONIA VIHAR ILLEGAL LIQUOR WORTH RS 7.5 LAKH BEING TRANSPORTED FROM CHANDIGARH TO DELHI SEIZED BY PANCHKULA POLICE 
Punjab Trending

PEDA INVITES APPLICATIONS FOR 20K AGRICULTURE SOLAR PUMPS

Read in:English

* Apply Online from 9th to 30th September; 60% Subsidy for General Category Farmers, 80% for SC Farmers: Aman Arora * ⁠In dark zones, pumps to be allocated to farmers who have micro (drip/sprinkler) irrigation systems * Punjab Govt Reserves 2000 Solar Pumps for SC Farmers, 3000 for Gram Panchayats

(MOREPIC1)Face2News/Chandigarh 

In a move to harness solar power for greening the agriculture sector in Punjab, the Punjab Energy Development Agency (PEDA) has invited applications for 20,000 solar pumps (Surface & Submersible) dedicated to agricultural use.

Disclosing this at a press conference in Sangrur, on Saturday, Punjab New and Renewable Energy Sources Minister Mr. Aman Arora said that farmers interested in installing solar pumps can now apply online at www.pmkusum.peda.gov.in from September 9th to September 30th, 2024. Farmers have the option to apply for solar pumps with capacities of 3, 5, 7.5, and 10 HP. A subsidy of 60% for General category farmers and 80% for Scheduled Caste (SC) farmers is available for the solar pump installations. Additionally, the state government has set aside 2000 solar pumps for SC farmers and 3000 for Gram Panchayats, he added.

(SUBHEAD)In areas classified as dark zones (over-exploited ground-water blocks), these pumps will be allocated to farmers who already have micro (drip/sprinkler) irrigation systems installed on their bore-wells. Additionally, farmers and Panchayats utilising diesel pumps to extract water from village ponds, farm ponds, or canal water diggies are also eligible under the scheme, informed Mr. Aman Arora.

The cabinet minister categorically said that the farmers who have PSPCL electric motor connections or have installed solar pumps for irrigation in their names or in the name of their family members are not eligible to apply under this scheme. The interested farmers can visit www.pmkusum.peda.gov.in for more details and download the brochure of the scheme.

37 safe blocks in 12 districts

PEDA has identified 37 safe blocks, where groundwater is on safe level, in 12 districts of the state. Talwandi Sabo, Sangat, Rampura, Gidderbaha, Lambi, Malout, Sri Muktsar Sahib, Fazilka district’s Abohar, Arniwala Sheikh Subanpur, Khuian Sarwar, Makhu, Dina Nagar, Dorangala, Sri Hargobindpur, Hoshiarpur’s Hoshiarpur-II, Bhunga, Hazipur, Mahilpur, Talwara, Mukerian, Mansa’s Budhlada, Jhunir, Sardulgarh, SBS Nagar’s Balachaur and Saroya, Pathankot’s Bamyal, Dhar Kalan, Narot Jaimal Singh, Pathankot, Sujanpur, Gharota, Patiala’s Ghanaur, Ropar’s Anandpur Sahib, Ropar & Nurpur Bedi and SAS Nagar’s Majri block falls under safe zone. The farmers of these safe blocks can apply for pumps without any rider. 

0 Comments
15,596 articles
View all articles