Sunday, 01 November 2026
Breaking News
SHIMLA ED CONDUCTED SEARCH OPERATION IN CHANDIGARH, MOHALI AND ZIRAKPUR MLA SANDEEP JAKHAR AND SUPPORTERS DETAINED BY POLICE EN ROUTE TO MEET CM MANN 1 NOVEMBER IS THE DAY PUNJAB WAS DIVIDED, NOT THE DAY CHANDIGARH WAS FOUNDED: SHIROMANI PUNJAB FORUM ABOHAR’S GOVT. DE-ADDICTION CENTER GETS TOP POSITION IN TREATMENT THE 7TH EDITION OF LATE SHRI PANNA LAL CRICKET TOURNAMENT FROM NOV.10 PECFEST 2026 DAY 2 SHOWCASES INNOVATION, ARTISTRY AND RHYTHM AT PUNJAB ENGINEERING COLLEGE MASSIVE FIRE ENGULFS TRUCK; DRIVER AND CONDUCTOR NARROWLY ESCAPE PUNJAB GOVERNMENT HAS SHUT THE DOOR ON FARMERS SEEKING LOANS FROM COOPERATIVE BANKS: SUNIL JAKHAR PROTEST AGAINST AJAY’S MURDER CONTINUES AS KEY ACCUSED NOT HELD APPEAL TO HOME MINISTER AMIT SHAH TO INTERVENE AND LIFT BAN ON SALE OF INDIVIDUAL PROPERTY SHARES IN CHANDIGARH
Punjab Trending

FOUR ANIMALS DIE DUE TO ELECTROCUTION IN RAIN WATER

Raj Sadosh/Abohar.

Four cattle died this morning in Subhash Nagar here after coming into contact with electrified water resulting from recent rainfall. Residents reported that a street in Subhash Nagar—which leads to Waryam Nagar—remained waterlogged because rainwater from the heavy downpour, lasting from last night until morning, failed to be drained away. Around 5:00 AM, the accumulated water suddenly became electrified, instantly killing two bulls and two cows. Fortunately, no residents were passing through the area at the time. People are currently forced to wade through the waterlogged streets.

Locals alleged that the incident was caused by 11,000-volt power lines passing near their homes. They also cited issues with clogged sewage lines and demanded that the Municipal Corporation urgently improve the sewerage system to facilitate proper drainage.

The city experienced heavy rainfall last night, causing waterlogging in most low-lying areas. Due to a power outage, the water remained stagnant in many neighbourhoods until morning. The newly appointed Mayor and the Municipal Corporation team toured the city and activated the disposal pumps after electricity supply resumed, allowing drainage operations to begin. School children faced the greatest difficulty commuting, and some schools even declared a holiday. The administration had been in charge of this area for four months but had completely neglected sewerage lines desilting issues, residents said.

0 Comments