What, when & where in the city?

CHANDIGARH WATER SUPPLY SHUT DOWN ON SIXTH, NINTH AND 12TH OF JUNE AS PSPCL TO REPAIR 66 KV MORINDA KAJAULI DC LINE

June 04, 2020 08:48 PM

Chandigarh (Face2News)

Due to an urgent repair on 66 KV Morinda-Kajauli DC line has to be carried out by PSPCL from 9 am to 5 pm on 6th June, 9th June and 12th June 2020 for erection of 2 extension towers. During this period, there will be no pumping of raw water from Kajauli to water works sector 39, Chandigarh. Therefore, the timings of water supply for whole of the city shall be as under: 

6th, 9th and 12th June, 2020

Morning supply:  From 3.30 am to 9 am (Full pressure)
Noon: No water supply
Evening Timings:
From 6.00 PM to 9.00 PM (At low pressure)

The water supply on 7th, 10th and 13th June, 2020 will be at normal pressure.

The residents are advised to store adequate water in the mornings on above dates and to bear with MC Chandigarh

Have something to say? Post your comment
Copyright © 2017, Face 2 News, All rights reserved. Terms & Conditions Privacy Policy Disclaimers