Saturday, 20 June 2026
Breaking News
JOURNALISTS ACT AS GUIDES FOR GOVTS AND ADMINISTRATIONS: GULAB CHAND KATARIA HAPPY KUMAR FROM MUKTSAR WINS A PRIZE OF RS 1 LAKH VIDEO OF INTOXICATED YOUTH GOES VIRAL IN ABOHAR FOR THE THIRD CONSECUTIVE DAY 84 DONATE BLOOD, OFFER A NEW LEASE OF LIFE TO COUNTLESS UNKNOWN FAMILIES CHANDIGARH POLICE SUCCEEDED IN BUSTING AN ANOTHER MODULE BY ARRESTING THE 3 OPERATIVES LINKED TO FOREIGN-BASED GANGSTER GOLDY DHILLON GANG. AS AI RESHAPES CAREERS, WPU GOA ADVOCATES A TRANSDISCIPLINARY APPROACH TO HIGHER EDUCATION PMDA CEO CONDUCTS GROUND INSPECTION OF INFRASTRUCTURE PROJECTS IN PANCHKULA SMILES RETURN TO THE FACES OF FIVE CHILDREN AS PUNJAB GOVT FACILITATES REUNION WITH THEIR FAMILIES PANCHKULA POLICE HORSES TO PATROL HILLS, NARROW LANES, VILLAGES AND ISOLATED AREAS STUDENTS PROMOTE HEALTHY LIVING THROUGH SATTVIC DIET PLATTER COMPETITION
Punjab Trending

PEDA INVITES APPLICATIONS FOR 20K AGRICULTURE SOLAR PUMPS

Read in:English

* Apply Online from 9th to 30th September; 60% Subsidy for General Category Farmers, 80% for SC Farmers: Aman Arora * ⁠In dark zones, pumps to be allocated to farmers who have micro (drip/sprinkler) irrigation systems * Punjab Govt Reserves 2000 Solar Pumps for SC Farmers, 3000 for Gram Panchayats

(MOREPIC1)Face2News/Chandigarh 

In a move to harness solar power for greening the agriculture sector in Punjab, the Punjab Energy Development Agency (PEDA) has invited applications for 20,000 solar pumps (Surface & Submersible) dedicated to agricultural use.

Disclosing this at a press conference in Sangrur, on Saturday, Punjab New and Renewable Energy Sources Minister Mr. Aman Arora said that farmers interested in installing solar pumps can now apply online at www.pmkusum.peda.gov.in from September 9th to September 30th, 2024. Farmers have the option to apply for solar pumps with capacities of 3, 5, 7.5, and 10 HP. A subsidy of 60% for General category farmers and 80% for Scheduled Caste (SC) farmers is available for the solar pump installations. Additionally, the state government has set aside 2000 solar pumps for SC farmers and 3000 for Gram Panchayats, he added.

(SUBHEAD)In areas classified as dark zones (over-exploited ground-water blocks), these pumps will be allocated to farmers who already have micro (drip/sprinkler) irrigation systems installed on their bore-wells. Additionally, farmers and Panchayats utilising diesel pumps to extract water from village ponds, farm ponds, or canal water diggies are also eligible under the scheme, informed Mr. Aman Arora.

The cabinet minister categorically said that the farmers who have PSPCL electric motor connections or have installed solar pumps for irrigation in their names or in the name of their family members are not eligible to apply under this scheme. The interested farmers can visit www.pmkusum.peda.gov.in for more details and download the brochure of the scheme.

37 safe blocks in 12 districts

PEDA has identified 37 safe blocks, where groundwater is on safe level, in 12 districts of the state. Talwandi Sabo, Sangat, Rampura, Gidderbaha, Lambi, Malout, Sri Muktsar Sahib, Fazilka district’s Abohar, Arniwala Sheikh Subanpur, Khuian Sarwar, Makhu, Dina Nagar, Dorangala, Sri Hargobindpur, Hoshiarpur’s Hoshiarpur-II, Bhunga, Hazipur, Mahilpur, Talwara, Mukerian, Mansa’s Budhlada, Jhunir, Sardulgarh, SBS Nagar’s Balachaur and Saroya, Pathankot’s Bamyal, Dhar Kalan, Narot Jaimal Singh, Pathankot, Sujanpur, Gharota, Patiala’s Ghanaur, Ropar’s Anandpur Sahib, Ropar & Nurpur Bedi and SAS Nagar’s Majri block falls under safe zone. The farmers of these safe blocks can apply for pumps without any rider. 

15,597 articles
View all articles